The Final Check

The goal of this Eco Design Advisor series of articles in eleven issues of The Shed magazine has been to show the stages of turning a cold, damp 1986 cottage into a warm dry one, using good eco design principles. We wanted to convert the cottage from a mouldy dump into a bright, healthy home that would need little maintenance for the next five years

The renovated cottage reaches its goal

The goal of this Eco Design Advisor series of articles in eleven issues of The Shed magazine has been to show the stages of turning a cold, damp 1986 cottage into a warm dry one, using good eco design principles. We wanted to convert the cottage from a mouldy dump into a bright, healthy home that would need little maintenance for the next five years. All on a budget and in the most eco-friendly way. One of the biggest parts of the job was the interior refurbishment. I knew I wouldn’t have time to do most of that myself in my annual leave. Reline or repair? We inherited peeling wallpaper, cracks in the plasterboard and mould. Should I rip out the old plasterboard and re-line? Or strip the wallpaper, repair the cracks and dings, skim-coat and repaint? I got quotes from four contractors for each of the two options. Though there were some big differences between the contractors, on average it would cost slightly more to repair than to reline. When I pulled off some of the wallpaper I could see the plasterboard was mostly sound and the framing straight enough not to need attention. If I were to reline, though, I’d be sending more than a tonne of plasterboard to landfill, and one of our main aims was to limit the amount of solid waste generated. I’d still need the same amount of paint and probably even more stopping compounds. Also the reline quotes didn’t include a figure for disposal of the waste. So I decided to repair and spend a little more, to save on waste.

Choosing the contractor

It’s really important to get the right person, someone you can work with and trust. The tradesman I chose to do 24 the wallboard repairs and skim-coating wasn’t the cheapest but he was very experienced and knowledgeable. He came with the best references and he was easy to talk to. In order to fit more insulation, I was planning to install a new ceiling under the exposed rafters. This meant carefully removing the existing 30 x 10 mm timber scotia. I stored it for reuse in other projects and Dennis did a beautiful job of square-stopping (without a scotia) against the new ceiling for a cleaner look.

Mould treatment

The interior mould was mostly on the vinyl wallpaper and hadn’t penetrated into the board. I would have needed to think again if it had, because removing mould from porous building materials like plasterboard or timber is practically impossible. This is because the mould filaments (hyphae) penetrate deep into the material and are out of reach of mould killers, so they can regrow from the inside. The exterior mould was superficial and easily dealt to with a good wash and anti-mould.



Kitchen

The basic 1980s kitchen was sound: good for another five years. A good clean and repaint made a world of difference and anyway I didn’t have the budget to upgrade it. The range and fridge were munted so they went to the scrap dealer. There was no rangehood. Lack of a rangehood contributes to mould in a house, so I installed a new one vented to the outside.

Bathroom

The bathroom, sound but dilapidated, was also good for another five years. It had a shub but no extractor fan. I replaced the rusty vanity hinges and repainted the room. I planned to install a quiet fan wired to its own separate switch, with a run-on timer. This is a great way to make sure the fan runs on for a few minutes after you leave the bathroom. It helps get rid of the excess moisture after a shower and so reduces the risk of mould. But I dropped the ball on this one and forgot to ask the electrician to run the necessary cable in the rafter space between the switch and the fan location, before the new ceiling went in. So I had to settle for a through-wall extractor wired to a nearby light, missing out on the run-on feature.

Floors

As I mentioned in last month’s article, the existing floor had unsightly patches and the finish was worn. In the interests of durability and appearance I overlaid it with bamboo click-together strip flooring in high-wear areas and cork tiles in the bathroom and bedrooms. 



Windows and doors

The existing aluminium joinery was sound and weathertight. The moisture damage on the windowsills was all internal, from condensation. Like all single-glazed joinery it didn’t do much for the thermal performance. However it let light in, kept the weather out, and should continue to function for another ten years. Not to mention that I didn’t have budget to upgrade it. I added security stays to improve the ventilation options. Many homes are shut up all day, which leads to under-ventilation, condensation, and overheating in summer. In the future, I could retrofit double glazing into existing units or replace them with new double-glazed thermally broken aluminium, PVC or timber units for better thermal performance. This is a rapidly changing field and there may be new technologies available by then. The choice will depend on costs at the time.

Cladding and roof

The cladding was OK. There was no damage showing and it needed only a repaint. The mould in the shady areas was superficial and I treated it as mentioned above. To discourage future mould growth I removed foliage that was causing excessive shading. The roof, painted corrugated steel, was sound. I took a sheet off to check the underside for rust. A waterblast and repaint was all it needed.



Budget

The work took place in winter 2010. The original budget was $25,000 but, as is usual for a renovation, not only did the scope of the work increase but there were some cost overruns. The final figure was $35,000.



The result?

After 2½ years accommodating two adults and a young child, the cottage has internal and external finishes in good condition, showing the benefit of good preparation. The floors still look like new. The house is easy to clean. The living areas need almost no heating in winter because of the emphasis on insulation and letting the sun in. Running costs are low. Insulation and solar access coupled with good moisture control mean there are no mould problems. The tenants love the way the house is comfortable and healthy and don’t want to leave.



Share:

More Posts

Turning back time – a waterwheel replica

When a Marlborough farmer with a passion for history took to his stream with a digger, he knew what he was looking for and came up trumps. John Walsh, of Woodbourne Farm, near Blenheim, was searching for remains of the waterwheel that powered the province’s first flour mill in the mid-1850s.
The concrete weir, although breached in a couple of places, was still standing on the Mill Stream, along with rusty debris from the metal operating system. The waterwheel itself had rotted away, save for two blades (or paddles) and a portion of the rim, but when John went digging below the weir, he unearthed the wheel’s wooden hub virtually intact.
“There was enough left to make a pattern from which to build a replica,” says John, who runs a private museum on the property, Woodbourne Homestead and Historic Farm, which is a NZ Heritage-registered site.
The waterwheel had been built for the original landowner, Henry Godfrey, by the Barton Brothers, who were early bridge builders in Marlborough. “These structures were built by the finest-quality tradesmen,” says John. But despite the workmanship, the water-powered mill operated for less than two decades, closing in 1873. Unlike the gentle streams of England, the meandering Marlborough creek could turn from a trickle to a torrent in a matter of hours. “It wasn’t a hugely successful site,” says John.

Create a classy TV stand

This television stand has been designed for a flat-screen 32-inch television and has also been designed to be made with minimal tools, enabling the weekend warrior/hobbyist to make it in not much more than a day. You certainly do not need advanced skills to make it. To complete it in a day, the glueing up of the timber will need to be done the day before, and obviously the stain and varnish will need to be done over several days.
While I have the equipment in my home workshop to machine the timber, I want to stress that this television stand could be made in the home workshop or garage with little in the way of tools. For example, you could ask the timber yard to dress the timber for you (you might even find the sizes you require already dressed at the big shed DIY stores), and all the cutting could be done with a handsaw.

Preserving the tools of yesteryear

Collecting and preserving tools and machinery used by generations gone by is a passion and obsession for many sheddies. There’s nothing like using the shed for a restoration project on something that was made to last. Getting up close to the work of craftsmen and tools made with pride.
Our mainly rural pioneering past has meant bygone equipment is often left lying about and rusting in old farm sheds or thrown out at the tip but sometimes reverently collected and restored by people who care.
One of these is farrier Kevin Schimanski of Wanganui. A lifetime of shoeing and riding horses has kept Kevin pretty fit. Aged 78, he still shoes horses and enjoys getting into the saddle to play polo.